Machines for the installation of new pipelines

Microtunnelling is a push-pull no-dig technology, suitable for the installation of new pipelines, which allows tunnel crossings of roads, railways, waterways, areas subject to environmental protection, etc. without the need for trench excavations.

Tech Form

microtunnel OS-150 EN
TYPE OS-146 150 175 195
IN diameter mm 1450 1660 1880
Excavator std. x x x
Conveyor belt std. x x x
Powerpack kW 15 22 30
Roadheader opt. opt. opt. opt.
Powerpack kW 22 29 41
Microtunnel PO-2002 EN
TYPE PO 2002 2003 2004
Max. pipe OD mm 600 700 800
Max- torque Nm 15000 18000 20000
Jacking force ton 80 90 100
Max. pipe lenght mt. 1 1 1
Powerpack kW 75 105 110